
The large capacity Chillers range from 60 kW – 750 kWs, they are skid mounted with custom built frames with certified lifting points to ensure logistics are quick and easy. Our chillers have the ability to be synched together to create a larger capacity cooling plant.
Combined with the air handlers, pumps, chilled water hose, buffer tanks and heat exchangers, Active Air can provide you with a complete chiller solution suitable to your requirements.
Features of Large Capacity Chillers
- Air Cooled Chillers
- Range of reverse cycle chillers
- Range of low temperature chillers
- Each with custom built galvanised steel frames with certified lifting points
- Camm lock fitting and Powerlock connections for quick and easy installation
- Condenser fan guards for protection whilst onsite??
- Ability to synch chillers together to create a larger cooling plant
Our Range of Large Capacity Chillers
With such a large range of chillers at varying capacities we can handle any size chiller plant required.
Chiller Capacity
60 kW – 750kW
Flow Rate
4.2 – 54 l/s
Temperature Range
5°C – 20°C
Features
Reverse Cycle Options
Low Temp Options
Power Requirements
Three Phase Power Circuit Breaker Dependant on Chiller
Get in touch with us now 1800 50 50 47, a member of our team will be able to confirm the best chiller for your situation.
Related Equipment
Our Solution for You
Get in touch with us now 1800 50 50 47, and we’ll develop the most efficient solution for you.
Immediate Response
Just a phone call away.
Site Inspection
On-site team inspection if needed.
Solution Design
Tailored solutions for your specific needs.
Quote Provision
Clear Transparent pricing.
Fast Deployment
Rapid equipment deployment.
Qualified Installation & Commissioning
Quick and professional setup.
24/7 Availability
Ready to act within hours.

Active Air has been a trusted provider of temporary chiller solutions for over 50 years, offering comprehensive systems for various applications.
Our experienced team handles everything from emergency responses to meticulously planned events, ensuring tailored solutions and unmatched excellence.
Chiller Case Studies
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
