Large Capacity Chillers

Large capacity chillers

The large capacity Chillers range from 60 kW – 750 kWs, they are skid mounted with custom built frames with certified lifting points to ensure logistics are quick and easy. Our chillers have the ability to be synched together to create a larger capacity cooling plant.

Combined with the air handlers, pumps, chilled water hose, buffer tanks and heat exchangers, Active Air can provide you with a complete chiller solution suitable to your requirements.

Features of Large Capacity Chillers


  • Air Cooled Chillers
  • Range of reverse cycle chillers 
  • Range of low temperature chillers  
  • Each with custom built galvanised steel frames with certified lifting points 
  • Camm lock fitting and Powerlock connections for quick and easy installation 
  • Condenser fan guards for protection whilst onsite??
  • Ability to synch chillers together to create a larger cooling plant

Our Range of Large Capacity Chillers

Chiller Capacity

60 kW – 750kW

Flow Rate

4.2 – 54 l/s

Temperature Range

5°C  – 20°C

Features

Reverse Cycle Options


Low Temp Options

Power Requirements

Three Phase Power Circuit Breaker Dependant on Chiller

Get in touch with us now 1800 50 50 47, a member of our team will be able to confirm the best chiller for your situation.

Related Equipment

Large Capacity Air Handlers

Large Capacity Air Handlers

The large capacity air handler units match perfectly with our small capacity chillers to provide a complete climate control solution for the smaller jobs

Pumps

Provides both heating and cooling options

Heat exchangers

Heat Exchangers

Provides both heating and cooling options

Small capacity chillers

Small Capacity Chillers

Small in size and easily mobile providing the perfect solution for the smaller jobs with limited space.

Our Solution for You

Get in touch with us now 1800 50 50 47, and we’ll develop the most efficient solution for you.

Immediate Response

Just a phone call away.

Site Inspection

On-site team inspection if needed.

Solution Design

Tailored solutions for your specific needs.

Quote Provision

Clear Transparent pricing.

Fast Deployment

Rapid equipment deployment.

Qualified Installation & Commissioning

Quick and professional setup.

24/7 Availability

Ready to act within hours.

Active Air has been a trusted provider of temporary chiller solutions for over 50 years, offering comprehensive systems for various applications.

Our experienced team handles everything from emergency responses to meticulously planned events, ensuring tailored solutions and unmatched excellence.

Chiller Case Studies

Tokyo Olympics

Tokyo Olympics

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Viscount Pact Group Chiller Hire

Viscount Pact Group Chiller Hire

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

A fast Chiller solution for a manufacturing company

A fast Chiller solution for a manufacturing company

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Tokyo Olympics

Tokyo Olympics

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Viscount Pact Group Chiller Hire

Viscount Pact Group Chiller Hire

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

A fast Chiller solution for a manufacturing company

A fast Chiller solution for a manufacturing company

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Tokyo Olympics

Tokyo Olympics

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Viscount Pact Group Chiller Hire

Viscount Pact Group Chiller Hire

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

A fast Chiller solution for a manufacturing company

A fast Chiller solution for a manufacturing company

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Tokyo Olympics

Tokyo Olympics

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Viscount Pact Group Chiller Hire

Viscount Pact Group Chiller Hire

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

A fast Chiller solution for a manufacturing company

A fast Chiller solution for a manufacturing company

Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…

Contact Us

Give us a call or send us an email, we endeavour to answer all enquiries within 24 hours on business days.

info@activeair.com.au

1800 50 50 47