
Our reverse cycle chillers are available in a variety of sizes, offering the ideal solution for both cooling and heating requirements.
When paired with our air handlers, pumps, and heat exchangers, Active Air delivers a complete and efficient chiller solution tailored to your needs.
Features of Reverse Cycle Chillers
- Air Cooled Chiller
- Ability to cool and heat
- Great option for long term hires that may span across different seasons requiring both heating and cooling.
- Each with custom built galvanised steel frames with certified lifting points
- Camm lock fitting and Powerlock connections for quick and easy installation
- Ability to synch chillers together to create a larger cooling plant
Our Range of Reverse Cycle Chillers
Chiller Capacity
15 kW – 550 kW
Flow Rate
0.64 – 22 l/s
Temperature Range
6°C – 25°C – Cooling
20°C – 55°C – Heating
Power Requirements
Three Phase Power Circuit Breaker Dependant on Chiller
Get in touch with us now 1800 50 50 47, a member of our team will be able to confirm the best chiller for your situation.
Related Equipment
Our Solution for You
Get in touch with us now 1800 50 50 47, and we’ll develop the most efficient solution for you.
Immediate Response
Just a phone call away.
Site Inspection
On-site team inspection if needed.
Solution Design
Tailored solutions for your specific needs.
Quote Provision
Clear Transparent pricing.
Fast Deployment
Rapid equipment deployment.
Qualified Installation & Commissioning
Quick and professional setup.
24/7 Availability
Ready to act within hours.

Active Air has been a trusted provider of temporary chiller solutions for over 50 years, offering comprehensive systems for various applications.
Our experienced team handles everything from emergency responses to meticulously planned events, ensuring tailored solutions and unmatched excellence.
Chiller Case Studies
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Tokyo Olympics
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Benella Victoria Temporary Concrete Manufacturing Facility to Build North East Link
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
Viscount Pact Group Chiller Hire
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
A fast Chiller solution for a manufacturing company
Active Air had the privledge of providing the temporary climate control for the shooting structures in the Tokyo Olympics 2020. The whole project stretched over 2 years with the breakout of COVID-19 across the world playing a big factor. The…
